What we build · 01
Timber frame panel houses
Wall panels made in our workshop in two to three weeks, delivered to your plot and assembled by crane. Any design, to your wishes.

01
Panels are made indoors, in our own workshop, in two to three weeks.
02
The main structure and the roof of a 100 m² house go up in five days.
03
All structures are calculated for heavy loads and snow.
04
Insulated walls need less energy to heat than masonry, and keep the warmth longer.
From our sites


